Scaffolding and Sidewalk Sheds in Queens

Sidewalk sheds, scaffolding, Jersey barriers and construction fencing for Queens buildings, handled by one team from the first quote to the last pipe out.

Since 2007

$2M general liability insurance

Bronx job: 2148 Story Ave (2021)

Based in the Bronx

Our base: 1078 Arnow Ave, Bronx, NY 10469 

Scaffolding and sidewalk sheds for Queens buildings

Scaffolding in Queens runs from co-op facade repairs to new construction that needs its whole frontage protected. We supply the shed, the scaffold and the street protection as one package, so one crew answers for all of it. Queens is one of the five boroughs we cover as an NYC scaffolding contractor. 

What we handle in Queens

Sidewalk shed

Overhead cover for the walkway while work runs above it.

Supported scaffold

Staging from the ground for facade crews, with its own DOB permit once it passes 40 feet.

Jersey barriers

Concrete or water-filled barriers between traffic and the work zone.

Construction fence

Fencing around construction lots, excavations and staging areas.

Local Law 11 facade repairs. The repair work behind the shed, so the shed comes down as soon as the repairs are signed off. 

Who we work with

  • o-op and condo boards, and their managing agents, planning facade repairs after a FISP inspection
  • General contractors on new Queens construction who want sheds, scaffolds, barriers and fencing from a single vendor
  • Owners whose shed has outlasted the work it went up for

Our record across the city

Our dated jobs so far are in Manhattan, Brooklyn and the Bronx, and each one, with its address and year, sits on our projects page. When we finish a Queens job, it goes here.

Shed and scaffold work in Queens today

The borough figures above date from July 2023. Check DOB’s active sidewalk shed map for the latest Queens count.

The Queens shed the city used as its example

In July 2023, the city picked a Queens building to show what a stalled shed looks like. The shed at the Queens County Supreme Court, 88-11 Sutphin Blvd in Jamaica, first went up under a DOB permit on April 21, 2017, more than six years earlier. The city announced a pilot to replace part of it with facade safety netting, and DOB later cited the courthouse as a place where netting took over from a shed until repairs could start.

That was city work at a city building, not our job. The lesson applies to Queens property owners: a shed can stand for years, and the 2026 rules add reporting requirements, milestones and possible penalties for qualifying sheds.

Shed up too long? Two ways out

Finish the repairs

Under the 2026 rules, sidewalk shed permits expire after 90 days. Most renewals need a progress report from a registered design professional, and owners have to show progress on the work behind the shed. Separate facade-repair milestones also apply to qualifying FISP projects. Our Local Law 11 facade repair page explains how we run the shed and the repairs on one schedule.

Ask about netting

DOB allows facade netting as an alternative to a shed in some circumstances. Your registered design professional decides whether it suits the building, and DOB still has to approve it.

Queens sidewalk shed permits follow the same rules as every other borough; our shed page covers the fees and exemptions.

Permits and offices in Queens

Shed and scaffold filings go through DOB NOW. DOB’s Queens Borough Office sits at 120-55 Queens Blvd in Kew Gardens. Shed footings, barriers, stored materials or other work in the roadway may need a separate DOT permit, which you apply for through NYCStreets.

Have a Queens building that needs a shed or scaffold? Send the address and we’ll quote it. 

Services we provide in Queens

  1. Before work starts: Queens sidewalk sheds over the walkway.
  2. While crews work: pipe scaffolding up the facade.
  3. Around the site: Jersey barriers in Queens at the curb and construction fencing around the lot.
  4. When a rig has stood a while or taken a hit: a scaffolding inspection before anyone climbs it.

Queens scaffolding FAQs

Do you take jobs anywhere in Queens?

Yes. We take shed, scaffold, barrier and fencing jobs across the borough, with the same crews, insurance and permit process we use everywhere else in the city.

No. Our base is in the Bronx at 1078 Arnow Ave, Bronx, NY 10469. Our crews travel from there to Queens jobs.

Each sidewalk shed permit expires after 90 days, and you renew it to keep the shed up. Most renewals need a progress report from a registered design professional. Qualifying sheds, including facade-repair jobs, can also face separate work-progress requirements and penalties. The rules apply citywide.

You may need one if shed footings, barriers, stored materials or other work occupy the roadway. It depends on the work and the location, and any DOT permit comes on top of the DOB shed permit.

Call (718) 971-4948 or send the quote form with the building address, the service you need, the building’s height and your start date. If a shed already stands, tell us when it went up.

Ready to price your Queens job?

We’ve served NYC since 2007 and carry $2M in general liability coverage. If your Queens building needs a shed, scaffold, barriers or fencing, send the address and start date for a written quote. If a shed is already up, include its install date so we can talk through the next steps.