Tube-and-clamp scaffolding for facade, masonry and construction work on any building shape, in all five boroughs. We install, rent and remove it.
Pipe scaffolding is steel tube locked together with couplers, one joint at a time. Crews build it piece by piece, so it bends around the parts of a building that a prefab frame can’t: cornices, setbacks, curved walls and tight courtyards. We rent, install and remove pipe scaffolding for NYC contractors, owners and managers in all five boroughs.
A pipe scaffold stands on base plates and climbs in steel tubes joined by couplers. Planks form the work platform, guardrails edge it and ties anchor it to the wall.
| Your building | Better fit | Why |
|---|---|---|
| Flat wall, no projections | Frame | Repeating frames and braces can be quicker to erect |
| Cornices, bays or setbacks | Pipe | Tubes and couplers can follow the wall's outline |
| Curved or irregular wall | Pipe | Adjustable couplers accommodate changing angles |
| Courtyard or tight footprint | Pipe | Individual bays can be configured for the available space |
We supply both systems. Send the building height and a photo of the wall, and we quote the one that fits.
Before a pipe scaffold goes up in NYC, three questions need answers: does it need a permit, who designs it, and who builds it.
A supported scaffold 40 feet or taller needs a DOB permit before crews erect it. The filing goes through DOB NOW: Build. Under BC 3314.2, a scaffold under 40 feet can skip the permit, but only if it is not an outrigger scaffold, carries no hoist over 2,000 pounds and has a design load of 75 pounds per square foot or less.
The code adds other conditions, such as limits on side-arm brackets and a restraint rule when height exceeds four times the base. DOB takes the scaffold permit application from a licensed or registered contractor, who has to keep the license and insurance current.
BC 3314.3.1 requires a registered design professional (RDP) to design supported scaffolds. The code lists exceptions, such as a scaffold under 40 feet with no hoist over 2,000 pounds and a design load of 75 pounds per square foot or less. A Licensed Contractor can also reference the BSA standard design on drawings in place of an RDP’s seal.
Workers who install, adjust, repair, maintain or remove a supported scaffold 40 feet or taller, and the person supervising them, need a DOB-approved course of at least 32 hours, plus an 8-hour refresher every 4 years (BC 3314.4.5.1). The same rule covers a sidewalk shed that serves as the base for such a scaffold. DOB also approves a 4-hour Supported Scaffold User course. OSHA’s scaffold standard, 29 CFR 1926 Subpart L, applies alongside the NYC Building Code.
DOT can require its own permit when a scaffold, shed or barrier reaches the street. DOT’s own example is a scaffold or shed with footings and a barrier that extend past the curb into the roadway. The same kind of permit covers closing a sidewalk or roadway, building a temporary walkway in the roadway, and driving a motorized vehicle across a sidewalk that has no approved drop curb or driveway. DOT takes those applications through its NYCStreets system.
We tell you up front whether your scaffold needs a permit and drawings, and we plan around it.
Rules as of November 19, 2026. Check DOB for updates.
Not sure if your scaffold needs a permit or drawings? Send the building address and height, and we’ll tell you before we quote. (718) 971-4948
One team runs every step, from your first call to the last tube coming down. Our scaffolding rental terms page explains how a term works.
Send us the address, height and type of work
We measure the wall and check the site
You get one written quote.
You sign, and we set the start date.
Our crew erects the scaffold
We check it while it stands
We take it down when your work ends.
We walk the site to confirm it’s clear
430 E 58th St, New York, NY 10022: scaffold installation, 2017
We installed scaffolding at this address in 2017. It’s the job we can name by address, service and year. See more NYC projects, or send us your building’s address and height and we’ll quote yours.
Many scaffold jobs need protection around them. A shed that serves as the base for a scaffold 40 feet or taller falls under the same 32-hour training rule, so one trained team covers both. See all our scaffolding services for the full list.
People walk under the work. Sidewalk sheds give them a covered path.
Some walls run too tall or too sheer to build up from the ground. Suspended scaffolding hangs from the roof and rides the facade.
Already have a scaffold up? A scaffolding inspection tells you what needs attention.
Traffic beside the work needs a hard edge, and an open lot needs a closed perimeter. Jersey barrier rental and construction fencing cover both.
Need a shed under the scaffold? One call covers both.
DOB’s rules apply citywide, so the same permit, design and training rules cover every borough. Areas we serve lists each one.
Five details move a pipe scaffold quote, so send them with your request:
We price setup, rental and removal together, so you see one number for the scaffold.
Yes, if the scaffold stands 40 feet or taller. DOB requires the permit before crews erect it, and the filing goes through DOB NOW: Build. A supported scaffold under 40 feet can skip the permit if it meets every condition in BC 3314.2, including no outrigger, no hoist over 2,000 pounds and a design load of 75 pounds per square foot or less.
Usually. BC 3314.3.1 requires a registered design professional to design supported scaffolds. The code lists exceptions, and a Licensed Contractor can reference the BSA standard design in place of an RDP’s seal. We tell you which path applies before we quote.
Workers who install, adjust, repair, maintain or remove a supported scaffold 40 feet or taller, and the person supervising them, need a DOB-approved course of at least 32 hours, plus an 8-hour refresher every 4 years. DOB also approves a 4-hour Supported Scaffold User course.
Pipe follows cornices, setbacks and curved walls. Frame goes up fast on a flat wall with nothing sticking out. The comparison table above shows how to choose, and we quote the system that fits your building.
Yes. We rent pipe scaffolding for a set term that matches your job. Tell us your start date and how long the work runs, and we quote that term.
Yes. We add a sidewalk shed, jersey barriers or construction fencing to the same quote and the same schedule.
The building address, the height or number of stories, the frontage length, the type of work and your start date. Tell us if the job also needs a sidewalk shed. Send it all through the quote form or call (718) 971-4948.
Send us the address, the height and the frontage. We carry $2M in general liability insurance, we have worked in NYC since 2007, and one team runs the job from quote to removal.
Sidewalk sheds, pipe scaffolding, Jersey barriers and construction fencing across Manhattan, Brooklyn, the Bronx, Queens and Staten Island since 2007. One team from quote to removal, backed by $2M in general liability insurance and OSHA-trained crews.
Copyright © 2026. All Rights Reserved.